home about us contact us site map  
Prime Mineral Inc
 
 
Blocks
Slabs
Tiles
Other Products
Facilities

Facilities and infrastructure at the mines have been developed depending upon the nature of the deposit to extract the stone putting emphasis on the largest size blocks that can be extracted.

At some of the mines, quarrying is being done with the help of manpower deployed with bulldozers. The overburden is cleared and the stones are extracted and brought to the platform for cutting to size and loading. All cutting is being done by special expansion agents to ensure a proper cubical shape easing the task for transportation and further processing.

At other points, heavy mechanical winches have been installed. The stones on the slopes is cleared from the base manually and dragged down to the point of loading. The loading on trucks is is done by the same winch for transportation to the factory site.

The company has installed Italian Gangsaws, Monolama Machines, Verticle Machine, complete Tile and Slab Line all of Italian Make. The processing of the end product is very closely monitored for quality to ensure production as per international standards.

Shipment of Goods: Within 45 days from the date of confirmation. Once shipped, the expected time it reaches the destination at any European, Canadian or U.S. Port is between 30 to 45 days.



  |  home   |  about us   |  contact us   |  site map   |
  All Rights Reserved by Prime Mineral Inc.